FVDED in the Park comes back for yet another year in 2019. This year introduces a unique stage design to the Northwest Stage, notably, the LED wall frames around the PA hangs. The video rig, provided by Promosa Management, was made up of 7mm LED tiles for the US wall and a 15mm product everywhere else. This combination made it possible for the VJs to operate the rig on 1 x 1080p output.

Role: Video Crew Chief

 
67117758_2343731109014186_8320464263630028800_o.jpg
 
67082133_2345521005501863_6055186030821113856_o.jpg
67717311_2345546058832691_7487659762654380032_o.jpg
67727925_2345540095499954_6441575402031808512_o.jpg
67061431_2345546345499329_4449747811289792512_o.jpg

Production Credits:
Client: blueprint events
Stage Design: Promosa Management
LX / Video Vendor: Promosa Management
Stage Manager: Sarah Costa
LD / LX Crew Chief: Dougal Dolhagaray
Video Crew Chief: Andre Dionne
Video Tech: Cody Dyson
Audio Vendor: Kian

Video Specs:
268 - 15MM LED Panels
171 - INFiLED AR7 Panels
6 - Linsn LED Controller
2 - NovaStar MCTRL660
1 - Folsom ImagePro II
1 - Folsom ImagePro
1 - Roland V-1SDI HD Video Switcher
1 - Cat5 Snake for Timecode
1 - SDI Snake for Guest VJ Cameras