Paradiso in 2019 was one for the books. Not only was this rig the most that had ever been hung on that stage but also neared the roofs limits. The 24 symmetrical pods that hung under the roof were a delicate dance with our friends at Precision rigging. After the 3-day load-in, this was also a technically interesting rig for us. Running 4 brand new NovaStar CVT 4Ks to pair with the MCTRL4Ks, we were able to run a fully redundant fiber system for this massive rigs 2 x 4K output requirement.

Role: Video Crew Chief // FOH Patch Tech

IMG_0423.jpg
 
65041966_2371405286254762_2723498174676205568_o.jpg
64975509_2371407799587844_6405852097446674432_o.jpg
 
82789535_2687573451279742_2720006310429982720_o.jpg

Production Credits:
Rigging: Precision Rigging
Lighting Vendor: R90 Lighting
Video Vendor: Promosa Management
Audio Vendor: Ford Audio Systems
Head Rigger: Matthew Klemisch
LX Techs: Terra, Kelsey King
Video Production Lead: Kai Johnson
Video Techs: Andre Dionne, Alex Champagne, ilia Sosner, Carson Hegedus, Cody Dyson
House VJ: TJ
FOH Audio: Gary Ford

Video Specs:
442 - 6MM LED Panels
516 - INFiLED AR7 Panels in Touring Frames
4 - Analog Way VIO 4K w/ HDMI 2.0 option card
4 - NovaStar MCTRL4K
4 - NovaStar CVT-4K